Skip to the guide
Data Constellationby Evidence Systems
Open the tool

Guide

How to use Data Constellation

Data Constellation finds the values your spreadsheets share and draws them as a night sky you can explore, chart and download. This guide covers every part of the tool, from preparing your files to building a slide deck.

New here? Take the quick tourUpdated 29 October 2026

Quick start

Four steps from opening the site to a downloaded chart, using a built-in example. Every example uses made-up figures.

  1. Open the tool. Go to constellation.evidencesystems.co.za. The Research extraction example loads by itself: twelve made-up reports pulled apart into sources, indicators, places, findings and quotes, drawn as a sky of shared values.
  2. Load Monthly figures. Choose Data at the top, then Monthly figures under Examples. (The same examples are in Start project.)
  3. Build a chart. Choose the bar-chart icon at the right end of the layout switch to open Charts, then choose Bar chart. It fills its slots for you and draws the sum of budget by province.
  4. Download it. Choose Download image in the settings panel, keep PNG and Sky, and choose Download. The picture is saved with the Data Constellation watermark in a band underneath.
The chart builder with a bar chart of the sum of budget by province, and its settings panel on the right.
The bar chart from step 3, with its settings panel.

Preparing your data

The tool links tables on the values they share, so the most useful thing you can do before uploading is make sure the same thing is written the same way in every file. Two or more tables that share something work best: a source ID, a place code, a date or a name.

What links well

  • Shared IDs and codes, such as source_id, place_code or project_no. Whole-number columns link only when their name says they are an ID: one that is id or ends in id, code, key, ref, _no, number or year.
  • Dates in any of these forms: 2024-03-05, 2024/03/05, 05/03/2024 (read day first, unless the first part is over 12), 05.03.2024, text with a month name and a four-digit year such as 5 March 2024, and Excel date cells. The same day matches across formats. Plain numbers are never read as dates.
  • Names written the same way, such as province or team names. Case and extra spaces are ignored, so “Gauteng” matches “GAUTENG”, but not “Gauteng Province”.
  • Several values in one cell, separated by a semicolon, a bar or a comma (ZA-GP; ZA-WC), or written as a list in brackets. Each value counts on its own when at least a fifth of the column’s cells hold lists, or when the column’s name ends in _ids.

What doesn’t

  • Free text, such as notes, quotes or descriptions: a column whose cells average more than about 48 characters, or more than five words, never links. It still shows on each record’s card and can feed a word cloud.
  • Amounts and decimals. Numbers with decimals never link, and whole numbers link only with an ID-like name (above).
  • Yes or no, status and category columns. A link whose columns hold two or fewer different values, or whose name looks like a status, type, role, title or description, starts switched off, because it would join almost everything. You can switch it on under Data.
  • Totals rows. A “Total” row is read as one more record and is added into charts with the rest. Remove totals before uploading (a waterfall chart can mark total rows itself).
  • Merged header cells and title rows. The first row of each sheet gives the column names, so keep one header row with a name in every column.

Before and after

Instead ofUseWhy
“Gauteng” in one file and “Gauteng Province” in anotherThe same name in both, or a code such as ZA-GPValues must match once case and spaces are ignored
Notes as the only thing two tables have in commonAn ID column, such as source_id, in bothLong text never links
A “Total” row at the bottomNo totals rowsA total row counts as one more record
Two header rows with merged cellsOne header row, a name for every columnThe first row gives the column names
Dates written as “Q3 FY24”A date such as 2024-09-30, or a separate year columnRecognised dates match the same day in other tables

Example files to try

Three small CSV files that link to each other: provinces, made-up sources and made-up indicators. They share place_code and source_id, giving two link types and 31 link points, a province map from the places file, and charts that join indicators to their province’s region. The figures are made up.

Download them, then drop them (or the zip) into Start project.

Uploading files

Choose Start project, then drop your files on the box or click it to choose them (Enter or Space work too). That starts a new project and replaces what is on screen. To add to the project you have, choose Add files to this project instead, or drop files anywhere on the sky. While an example is showing, added files replace it.

FilesHow they are read
CSV, TSV, TXTAs text with a header row. The separator (comma, tab, semicolon or bar) is worked out from the file. A file not saved as UTF-8 (as Excel on Windows often saves CSVs) is read as Windows text, and the notice says so.
Excel (.xlsx, .xls)Every sheet becomes a table, hidden sheets included. With several sheets, each is named “file / sheet”. Sheets with no data are left out, and the notice names them.
JSONA list of records, or an object holding lists of records (each list becomes “file / name”).
ParquetRead column by column; only the columns you keep are decoded. Whole numbers too big to keep exactly are kept as text, with a note.
ZipEvery table file inside, in any folder. Other files, such as documents and readmes, are left out and counted. Hidden files are skipped.

A table is named after its file, without the folder or extension; a second table with the same name becomes “name (2)”. Notes about what was read, and any problems (“has no rows with data”, “could not be read”), appear in a notice at the bottom of the screen for nine seconds, and stay under Load notes in the Data drawer (the latest load and any files added since) until you start over or start a new project. Files that aren’t tables, such as PDFs or pictures, are skipped, and the notice names them (“Skipped report.pdf: not a table file”); a text file that holds a delimited table still loads.

The Start a project window, with the drop zone, the six examples and the privacy line.
Start project: drop files, or explore an example.

While files load, a notice shows four steps (Reading, Checking columns, Finding links, Laying out) with Stop. Stop goes back to what was on screen before, with nothing half-built. If the large-file engine was already loaded, it stays loaded, so trying again doesn’t download it again.

Very large files

Any one file over 50 MB, uploads over 100 MB in all, or a table of more than 1 000 000 rows are read by the large-file engine (DuckDB-WASM). It runs in your browser tab like the rest of the tool and is downloaded once from this site the first time you need it; the notice gives its size. Such an upload always starts a new project and always opens Choose your data. Charts then use every record (some are drawn from a sample; see Charts), and the sky shows up to 12 000 records: a random sample, or the records behind the strongest links.

How much the sky draws

  • The Records view draws link points instead of records above 12 000 records or 60 000 lines (Orb above 4 000 records), and says so in the notice. Hiding tables or switching links off under Data brings the records back.
  • On a computer with a graphics card (WebGL 2), Constellation’s Records view draws bigger skies of 12 000 to 200 000 records and up to 1 000 000 lines. Its stars can’t be dragged, and labels show only in the hover card. Without a graphics card, the view shows link points.
  • The Link points view draws the 6 000 brightest points and their 30 000 strongest links.
  • In Chrome, when the tab uses more than 70% of its memory, the sky shows link points rather than records.

Choosing your data

Choose your data opens before anything is built when an upload is over 20 MB, has more than 150 columns, or would make more than about 100 000 links, and always for a very large file. Smaller uploads skip it and use everything. It lists the tables and their columns, and the links between them, strongest first.

  • Recommended ticks shared IDs and codes, short labels, dates and numbers, and switches on the strongest links up to about 60 000. It leaves out columns marked Long text, Mostly empty (filled in under 10% of rows), Same in every row, and those whose link would start switched off, each with its reason.
  • Only shared columns keeps the columns another table shares. Select all ticks everything, and Clear nothing.
  • Above about 300 000 links, only the shared ID and code columns start ticked and every link starts off.
  • Use 2 000 random records from each table keeps a sample of bigger tables. The sample is used everywhere, charts included.
  • The foot gives a live estimate (“With your choices: …”), with This may slow your computer. above 100 000 links. Load my choices builds only what is ticked; columns left out take no memory and are gone from cards and charts.

To change your choice later, choose Choose columns under Tables in the Data drawer, or + Add columns at the foot of a chart slot’s column list. Both read your files again and rebuild the project, keeping your link and colour choices (the chart you are on starts again from the gallery; slides stay). They are offered for your own files, not for the examples.

How linking works

The tool compares each column with every column in the other tables. Two columns link when they share at least two values, and those shared values make up at least 30% of the different values in the smaller column. Columns with the same name (ignoring case, spaces, underscores and dashes, so Project ID and project_id match) need only one shared value. Linked columns form a link type, named after their most common column name; the Data drawer lists them under Links found.

Every value that two or more records hold becomes a link point: a bright star. Each record is a small, faint point, joined by a line to every link point it holds. The more records share a value, the bigger its star.

A small example

places
place_codeprovince
ZA-GPGauteng
ZA-WCWestern Cape
ZA-ECEastern Cape
indicators
indicator_idplace_codevalue
IND-001ZA-GP1 209
IND-002ZA-GP30.5
IND-003ZA-WC59.1
IND-004ZA-EC2 104
The stars these two tables makeThree link points: ZA-GP joined to three records, and ZA-WC and ZA-EC each joined to two. Every record is a small dot joined by a line to its place code.ZA-GP 3 recordsZA-WC 2 recordsZA-EC 2 records
place_code has the same name in both tables, so it links. ZA-GP is held by three records (one place and two indicators), so it is the biggest star. indicator_id appears in one table only, and value holds numbers with decimals, so neither links.

Links that start switched off

Some links are found but start off, with the reason shown in the Data drawer as “Off: …”:

  • Looks like a status, label or category: two or fewer different values (yes or no columns), or a name such as status, type, role, title, notes or description together with 12 or fewer different values. A title column of hundreds of report titles is a real link and starts on.
  • Mixes many kinds of ID in one column: catch-all lists such as linked_ids or related_ids.
  • Same value in every record: when several links each hold one value shared by every record, one is kept on.

When two values join exactly the same records (an act’s number and its name, say), they become one star, and its card says “The same records also share …”.

Changing the links

  • Links found (in the Data drawer): untick a link to switch it off, or select one of its column chips to drop just that column. Links that are off sit in a folded list below.
  • Link two columns yourself: pick a column in each list and choose Link these columns. The message says how many values they share. Your links are marked “yours”. Long text can’t be linked, and the message says so.
  • Show records with no links draws the records that hold no shared value too (in Orb and Constellation).
  • Adding files looks for links across every table again but keeps your choices: links you switched off stay off (“Off: you switched it off”), column chips you dropped stay dropped, links you made stay while both columns exist, and colours stay with their link, table or star. The notice says so and how many links are new (“Kept your link and colour choices. Found 1 new link.”).
  • Tables that share no values at all leave the sky empty, and the notice says so and points to Charts.

The three views

The layout switch at the top holds Trace, Orb and Constellation, then Charts. All three layouts draw the same links: bright stars are link points, faint points are records, and lines join records to the values they hold. In Orb and Constellation, the tabs at the bottom switch between three views:

  • Records: every record and every link point.
  • Link points: only the link points, joined when records hold both; the more records they share, the stronger the line.
  • Tables: one big star per table, joined to the tables it shares values with. Each line is labelled with how many values they share and through which links.

Trace

Trace follows one value. It sits on the right as a large star; the records that hold it fan out in the middle, grouped by table; and the other values those records hold fan out on the left, grouped by link type (twelve per type, with “+ n more”). It opens on the value that joins the most tables, preferring a source ID. To trace another value, double-click its star in any layout, or choose Trace from this value on its card. Drag to move around and scroll to zoom.

Trace, following source SRC-001 on the right to its findings, quotes and source in the middle, and on to indicators and places on the left.
Trace: one source, the records that cite it, and what they lead to.

Orb

Orb wraps the sky round a slowly turning globe, with near stars brighter than far ones and labels on the near side. Drag to turn it, or use the arrow keys. Selecting a star turns it to face you. It draws up to 4 000 records.

Orb: the records and link points of the research example on a globe, with labels on the near side.
Orb: the same links on a turning globe.

Constellation

Constellation lets the links arrange the sky: records gather near their table, and shared values pull related records together. Drag a star to move it and the rest settle around it (except on the bigger skies a graphics card draws).

Constellation: clusters of records around glowing link points in blue, red and purple.
Constellation, Records view: colours show the three link types.
The Link points view: only the shared values, joined by lines weighted by the records they share.
The Link points view of the same data.

Moving around and looking closer

  • Zoom with the scroll wheel or a pinch, or the − and + buttons at the bottom right. The third button resets the view to fit everything.
  • Hover over a star (on a computer) for a card: a link point shows its value, its record count and a bar split by table; a record shows its table, row and first few fields.
  • Click a star to open its card on the right; the sky moves the star clear of the card. Click empty sky, choose ×, or press Esc to close it.
  • The notice at the bottom says when the view shows less than everything, and why.

Colours

Choose Colours at the top to open the drawer at its Colours section. Colour by has four modes:

  • Link type (the default): link points take their link type’s colour, in palette order; records stay a neutral blue-grey.
  • Table: records take their table’s colour; link points are white.
  • One colour: link points and tables are blue; records stay neutral.
  • Cluster: stars take the colour of the community they belong to, worked out with the Louvain method in the background. The eight biggest clusters take the palette in order and the rest are grey. A cluster is named after a value when one value holds at least half its records (“Cluster: Gauteng (342 records)”), otherwise by number. Point at a cluster in the drawer or the legend to light it up. Clusters are found for skies up to 20 000 stars and 200 000 lines.

You can also give things a colour of their own. The most specific one wins:

  1. one star: the This one row on its card;
  2. every point of a link type: the colour dot beside it under Links found, or Every … point on a point’s card;
  3. every record of a table: the colour dot beside it under Tables, or Every … record on a record’s card;
  4. the mode’s colour.

Each of the first three has a Reset on the card once it is set.

The palette is Blue, Red, Purple, Cyan, Amber, Pink, Green and White, and every swatch is named. Lines take the colour of the link point they run to. The legend at the bottom names each colour in use, with “+ n starred colours” for single stars (it is hidden on phones). Colours last in this tab only: Start over, a new project or an example clears them. Pictures and slides of a layout keep its colours and legend, and Export links writes each point’s colour name. In Charts, the Colours section lists the chart’s series or categories instead, each with a swatch, and Reset colours.

The drawer open at Colours, with the four Colour by modes and colour dots beside each table and link.
Colours: four modes, and a colour dot beside every table and link.

Finding things

  • Find a value, the search box at the top, matches any part of a value, including values merged into another point: up to 8 link points (biggest first) and up to 12 records. Enter opens the best match, the down arrow moves into the list, and × clears it.
  • Brightest points in the Data drawer lists the eight link points that join the most tables.
  • A link point’s card lists every record that holds it, by table (60 per table, then “and n more”), then “Also shared by these records”: the values those records most often share too.
  • A record’s card shows every field. Linked values are buttons in their point’s colour, with how many other records share them; choose one to open that point. “Closest records” lists the twelve records sharing the most values with it.
  • A table’s card (from the Tables view) lists its columns with their kinds and number of different values, says why a column doesn’t link (“Doesn’t link: long text”, “decimals” or “number without an ID-like name”), and shows a preview of the first 30 rows.

The Data drawer holds, in order: the counts, Colours, Brightest points, Tables (with a show or hide box and a colour dot for each), Links found, Link two columns yourself, Load notes, Export, Slides and Help (on phones), Examples with Start over, Show records with no links, and the privacy line with Cookie settings, Credits, Privacy and Get updates (when the mailing list is on).

A search for SRC open on the link point SRC-001, whose card lists its 11 records by table.
Find a value, and the card for link point SRC-001.

Charts

Choose the bar-chart icon at the end of the layout switch to open Charts. The gallery shows all 21 charts for one table: a tile is lit when the table can fill it, or the table with a linked table that holds one row per shared value, such as a list of provinces (such a tile says “Uses a linked table” and opens with the linked columns in place), and dimmed with what it needs when neither can. Once a chart is open, its slots can take columns from any linked table. With two or more tables, choose which with Table; Charts opens on the table that fits the most charts.

The chart gallery for the monthly figures table: most tiles lit, and the Gantt chart dimmed with what it needs.
The gallery lights the charts that fit the table.

Choosing a chart opens the builder. It fills the chart’s slots with the columns that fit best; change them under Columns. Each slot’s list shows every column with its kind, how many different values it holds and how much of it is filled. Columns that don’t fit are greyed with the reason (“Holds dates; this slot takes numbers”).

  • Shape: Combine values by (Count, Sum, Mean, Median, Min or Max, as far as the chart can use them: without a value column, only Count), Sort, Show the top (5 to 50, the rest as Other; a heat map and a highlight table say what they keep instead), Group dates by (Automatic, Day, Week, Month, Quarter, Year), bins, stacking and the rest, as each chart allows.
  • Text: edit the title and subtitle above the chart, the axis titles, and a source line.
  • View as table shows the numbers behind the chart; Download image and Add to slides are below it; All charts goes back to the gallery.
  • Column names are turned into labels (budget_rand reads “Budget (rand)”), and columns named for rand, amount, budget, cost or price are written as money (“R1.2 bn”, “R45 000”).
  • Hover over a mark for its figures, and click it to list the records behind it in the drawer (“Records behind Gauteng”), where you can also recolour it.
  • Line, area, timeline, Gantt, scatter, bubble and network charts, and choropleth and point maps, zoom with the dock’s buttons.

Which chart to use

To showTry
A figure for each categoryBar chart, highlight table
Change over timeLine or area chart
Shares of a totalPie and donut (a few parts), treemap (many)
How a total got from one figure to anotherWaterfall
Progress against targetsBullet graph
How values spreadHistogram, box and whisker
Whether two figures move togetherScatter plot, bubble chart, correlation matrix
Two categories at onceHeat map
Figures by placeChoropleth map; coordinates: point map
A headline number for a slidePictogram
Words in open answers or notesWord cloud
Tasks and datesGantt chart, timeline
Who or what connects to whatNetwork diagram

Every chart

Each entry lists the chart’s slots as the builder names them, and what the gallery says when the table can’t fill them. Every chart’s slots can also take columns from linked tables. “Exact on very large files” means the chart adds up every row of a file read by the large-file engine; the others are drawn from a random sample of 20 000 rows there.

Comparing amounts

Set categories side by side, or check them against a target.

Bar chart of the sum of budget by province, tallest for Gauteng.

Bar chart

One bar per category, as long as its total, average or count. Add a Group to split each bar into series.

Good for: Comparing a figure across provinces, sectors, months or any list of names.

Category needed
labels, whole numbers or dates, 2 to 1 000 different values
Value optional
numbers
Group optional
labels, whole numbers or dates, 2 to 8 different values
  • Shape: Combine values by, Sort, Show the top (5 to 50, the rest as Other), Group dates by, Grouped or Stacked when there is a Group, and Vertical or Horizontal.
  • With dates on the Category axis, the bars keep date order, so Sort is not offered.
  • Dimmed when the table can’t fill it: “Needs a column with 2 to 1 000 categories”.
  • Exact on very large files.
Heat map with provinces across and sectors down, each cell shaded by its budget.

Heat map

A grid of two categories (or a date and a category), each cell shaded by its value.

Good for: Month by province, sector by year, and other two-way tables.

Columns (X) needed
labels, whole numbers or dates, 2 to 1 000 different values
Rows (Y) needed
labels, whole numbers or dates, 2 to 1 000 different values
Value optional
numbers
  • Keep on each axis: the top 12, 20, 30 or 50 categories (for dates, the latest 24 or more periods). There is no Other. Group dates by shows when either axis holds dates.
  • Dimmed when the table can’t fill it: “Needs two columns with 2 to 1 000 categories, or a date and a category”.
  • Exact on very large files.
Highlight table of figures by province, each column shaded on its own scale.

Highlight table

A table of figures with each column shaded on its own scale, so the high and low values stand out.

Good for: Several measures per name, read as numbers rather than bars.

Rows optional
labels, whole numbers, dates or text
Columns needed
numbers, one or more columns
  • Up to 16 columns. Rows to show: up to 48, 80, 120 or 200 rows; the rest are cut, with no Other.
  • Dimmed when the table can’t fill it: “Needs a number column”.
  • Drawn from a sample on very large files.
Bullet graph of the share done for each task, against a target line.

Bullet graph

A bar per label for its value, a line for its target, and shaded ranges behind (below 60% of target, 60 to 90%, above 90%, unless you give range columns).

Good for: Progress against targets.

Label needed
labels, text or whole numbers
Value needed
numbers
Target needed
numbers
Range: low optional
numbers
Range: high optional
numbers
  • Shows the first 40 labels. Rows without a value or a target are left out.
  • Dimmed when the table can’t fill it: “Needs a label, a value and a target”.
  • Drawn from a sample on very large files.

Change over time

Follow a figure across dates or an ordered number.

Line chart of the sum of budget by month over two years.

Line chart

A line through each X value: a date (grouped by day, week, month, quarter or year) or an ordered number. Add more Y columns for more lines, or a Group for a line per group.

Good for: Monthly or yearly figures, and anything measured over time.

X (date or order) needed
dates or numbers
Y needed
numbers, one or more columns
Group optional
labels, whole numbers or dates, 2 to 30 different values
  • Up to 8 lines, the largest by total. With a Group, only the first Y column is drawn, one line per group, and the chart says so.
  • Zoom with the dock's + and − along the X axis.
  • Dimmed when the table can’t fill it: “Needs a date or number column and a number column”.
  • Exact on very large files.
Area chart of the sum of budget by month over two years.

Area chart

A line chart with the space under each line filled. With two or more series, choose Overlapping or Stacked.

Good for: Totals over time, and how series add up to them when stacked.

X (date or order) needed
dates or numbers
Y needed
numbers, one or more columns
Group optional
labels, whole numbers or dates, 2 to 30 different values
  • Same slots, caps and zoom as the line chart.
  • Dimmed when the table can’t fill it: “Needs a date or number column and a number column”.
  • Exact on very large files.

How values spread

See where the values fall, and which ones stand apart.

Histogram of budget, with most rows in the lower ranges.

Histogram

How many rows fall into each range of a number column. Add a Group to overlay up to six groups.

Good for: Seeing the spread of amounts, ages, durations or scores.

Value needed
numbers
Group optional
labels, whole numbers or dates, 2 to 6 different values
  • Bins are chosen for you; untick Automatic bins to set 3 to 80 with the slider.
  • Dimmed when the table can’t fill it: “Needs a number column”.
  • Exact on very large files.
Box and whisker chart of the spread of budget, with a few outliers above the whisker.

Box and whisker

The median, the middle half of the values (the box), the whiskers and the outliers, for the whole column or per category.

Good for: Comparing spreads between groups, and spotting unusual values.

Value needed
numbers
Category optional
labels, whole numbers or dates, 2 to 30 different values
  • Whiskers reach the furthest values within 1.5 times the box's height; values beyond are outliers. Up to 30 categories.
  • Dimmed when the table can’t fill it: “Needs a number column”.
  • Drawn from a sample on very large files.

Parts of a whole

Show how a total breaks down, or how it adds up step by step.

Pie chart of budget shares by province, with seven slices and Other.

Pie and donut

Each category's share of the total as a slice. Tick Donut for a ring.

Good for: A few categories (up to about seven) that make up one whole.

Category needed
labels, whole numbers or dates, 2 to 30 different values
Value optional
numbers
  • Shows the 7 largest categories and groups the rest as Other; a bar chart reads better with more.
  • Combine values by offers Count and Sum, the two a pie can show.
  • Dimmed when the table can’t fill it: “Needs a column with 2 to 30 categories”.
  • Exact on very large files.
Treemap of budget blocks by province, largest at the top left.

Treemap

Nested blocks sized by each category's total, with an optional second level inside each block.

Good for: Many categories that make up a total, such as a budget by department and programme.

Category needed
labels, whole numbers or dates, 2 to 500 different values
Second level optional
labels, whole numbers or dates, 2 to 50 different values
Value optional
numbers
  • Combine values by offers Count and Sum. Show the top keeps the largest and groups the rest as Other.
  • Dimmed when the table can’t fill it: “Needs a column with 2 to 500 categories”.
  • Exact on very large files.
Waterfall of a made-up project budget, from the opening budget through savings and changes to the closing budget.

Waterfall

How steps add up to a running total: increases in green, decreases in red, totals in blue, joined by dashed lines.

Good for: Budget changes, a balance from opening to closing, or how a figure moved.

Step needed
labels, dates, whole numbers or text
Change needed
numbers
Total marker optional
labels or whole numbers
  • Steps keep the order they first appear in. The first step is drawn as a total (the opening balance).
  • A Total marker column marks rows (such as "Total" or "Closing") that show the running total so far.
  • Dimmed when the table can’t fill it: “Needs a step column and a number column”.
  • Drawn from a sample on very large files.
Pictogram of the total budget as rows of dots, each standing for a round amount, the last one partly filled.

Pictogram

A total drawn as icons (person, house, coin, tree or dot), with one icon standing for a round number, split into up to eight groups.

Good for: One headline figure for a slide, such as staff, households or rand.

Value optional
numbers
Group optional
labels or whole numbers, 2 to 8 different values
  • The icon is chosen from the column's name unless you pick one. About 100 icons, never more than 200.
  • Dimmed when the table can’t fill it: “Needs rows to count”.
  • Drawn from a sample on very large files.

Relationships

See whether figures move together, or how names connect.

Scatter plot of spend against budget, rising from the lower left to the upper right.

Scatter plot

One point per row, placed by two number columns. Colour points by a category, and tick Trend line to draw a best-fit line with Pearson's r.

Good for: Checking whether two figures rise and fall together.

X needed
numbers
Y needed
numbers
Colour by optional
labels, whole numbers or dates, 2 to 8 different values
Label optional
labels, text, whole numbers or dates
  • Above 5 000 points the points are drawn as a picture, so the download is PNG only. Above 10 000, a random 10 000 are drawn.
  • Zoom in on both axes with the dock's buttons.
  • Dimmed when the table can’t fill it: “Needs two number columns”.
  • Drawn from a sample on very large files.
Bubble chart of spend against budget, with circles sized by a third number column.

Bubble chart

A scatter plot whose points are sized by a third number column.

Good for: Three figures at once, such as cost, reach and budget per project.

X needed
numbers
Y needed
numbers
Size needed
numbers
Colour by optional
labels, whole numbers or dates, 2 to 8 different values
Label optional
labels, text, whole numbers or dates
  • Rows with an empty or negative size are left out. The same 5 000 and 10 000 point rules as the scatter plot.
  • Dimmed when the table can’t fill it: “Needs three number columns”.
  • Drawn from a sample on very large files.
Correlation matrix of five number columns, mostly red where they rise together.

Correlation matrix

Pearson's r for every pair of number columns, from strongly negative (blue) through none (grey) to strongly positive (red).

Good for: A first look at which figures move together in a wide table.

Number columns needed
numbers, one or more columns
  • Up to 24 number columns. Its cells have no records behind them, so they can't be clicked.
  • Dimmed when the table can’t fill it: “Needs two or more number columns”.
  • Drawn from a sample on very large files.
Network diagram of tasks joined to the tasks they depend on.

Network diagram

Names joined by lines, from a From column to a To column, with names sized by how many links they have.

Good for: Who reports to whom, which task depends on which, or any list of pairs.

From needed
labels, text or whole numbers
To needed
labels, text or whole numbers
Weight optional
numbers
  • Shows the 500 most connected names and up to 3 000 lines, strongest first. A row that links a name to itself is skipped.
  • Dimmed when the table can’t fill it: “Needs two columns of names or IDs”.
  • Drawn from a sample on very large files.

Maps

Put figures on places, or points on coordinates.

Choropleth map of South Africa's provinces shaded by budget, with a legend of five classes.

Choropleth map

Countries, provinces or districts shaded by a figure, in 3 to 7 classes.

Good for: Figures per country or per province, such as budgets, rates or counts.

Place needed
labels or whole numbers
Value optional
numbers
  • Places with no data are hatched. See Maps for how places are matched and what to do when some don't match.
  • Dimmed when the table can’t fill it: “Needs a column of places (countries, provinces or districts)”.
  • Exact on very large files.
Point map of made-up survey points around the world, grouped into hexagons.

Point map

A point per row at its latitude and longitude, coloured by a category or sized by a number.

Good for: Sites, offices, survey points and anything with coordinates.

Latitude (or “lat, lon”) needed
numbers or labels
Longitude optional
numbers
Size optional
numbers
Colour by optional
labels or whole numbers
  • Above 5 000 points they are grouped into hexagons (switch back under Map). Rows with coordinates out of range are listed under Map, not drawn.
  • Dimmed when the table can’t fill it: “Needs latitude and longitude columns”.
  • Drawn from a sample on very large files.

Text

Find the words that come up most in a column of text.

Word cloud of the most used words in made-up interview quotes.

Word cloud

The 150 most used words in a text column, sized by how many rows hold them. Common English words and numbers are left out.

Good for: Open answers, notes, titles and descriptions.

Text needed
text or labels
  • Each word counts once per row. Colours mark five count bands, each named in the legend.
  • Dimmed when the table can’t fill it: “Needs a text column”.
  • Drawn from a sample on very large files.

Planning and dates

Lay tasks and events along a calendar.

Timeline of project tasks by start date, labelled above and below the axis.

Timeline

A point per row on a date axis, labelled, with optional lanes for up to eight groups.

Good for: Events, publications, site visits and milestones.

Date needed
dates
Label needed
labels, text or whole numbers
Lanes optional
labels, whole numbers or dates, 2 to 8 different values
  • A label that would collide with another is left out; the hover card and View as table still name it.
  • Dimmed when the table can’t fill it: “Needs a date column and a label column”.
  • Drawn from a sample on very large files.
Gantt chart of project tasks as bars from February to May.

Gantt chart

A bar per task from its start date to its end date, sorted by start.

Good for: Project plans, contracts and anything with a start and an end.

Start needed
dates
End needed
dates
Task needed
labels, text or whole numbers
Group optional
labels, whole numbers or dates, 2 to 8 different values
  • A task on several rows gets one bar from its earliest start to its latest end. Rows that end before they start are skipped and counted.
  • Dimmed when the table can’t fill it: “Needs start and end dates and a label”.
  • Drawn from a sample on very large files.

Charts across linked tables

A chart belongs to one table, but its slots can take columns from any table linked to it. In a slot’s column list, a linked table’s columns sit under a heading that names the join, such as “district_offices → via province”.

  • One step only. A linked table must share a link with the chart’s own table; tables linked only through a third table are not offered. Where several columns could join, the pair that shares the most values is used.
  • Several rows per key. When the linked table has several rows for one value, they are combined first: numbers by the chart’s Combine values by, labels and dates by their most common value. A note under the title says how (“… had up to 4 rows per key; values were summed before joining.”).
  • Counted once. When the chart’s table has several rows for one value and a joined number is summed, it is counted once per value in each mark, and a note says so.
  • The line under the title names the join, such as “Joined: monthly_figures + district_offices on province”. Downloads and slides carry it too, and the drawer’s “Records behind” lists the linked table’s records as well.
  • Only links that are on join charts. A table linked only through a link that is off is not offered; its slot lists say which link to switch on (“district_offices: switch on the province link under Data to use it.”). A chart that used its columns leaves them out and says so, and gets them back when the link is on again.

Maps

The gallery has three map entries: the choropleth map (places shaded by a figure), the point map (a point per row at its coordinates, grouped into hexagons above 5 000 points) and the pictogram (a total in icons). Maps are drawn in your browser; drag to move, and zoom with the scroll wheel or the dock.

A choropleth map of South Africa's nine provinces shaded in five classes of budget, with the legend underneath.
A choropleth map of the Provinces example.

How places are matched

  • Countries by ISO 3166 code (two letters, three letters or the number), by name, or by a common other name (“Ivory Coast”, “DRC”, “Swaziland”).
  • Provinces and states by ISO 3166-2 code, old or new (ZA-KZN and ZA-NL both find KwaZulu-Natal), by postal code (GP), or by name.
  • Districts by name only.
  • Names are compared without case, accents or punctuation, and words such as “Province”, “District” or “City of” are ignored. Codes match whether written ZA-GP, ZA GP or za.gp.

Under Map in the settings, a folded list says how many places didn’t match. Each one offers Use with the closest name (when it is close enough), or says there is no close name. Those fixes are kept for this map until you open the chart again from All charts.

Levels and boundaries

  • Level: Countries, Provinces or Districts. The map picks one from your values (Districts when the column’s name says district or municipal), and Country picks which country’s provinces or districts to draw.
  • Countries and provinces come from Natural Earth, credited as “Boundaries: Natural Earth”. Districts come from geoBoundaries, for about 120 countries whose licences allow it, and are loaded when you choose them; the credit names the licence and year. Elsewhere, Districts is not offered.
  • The credit sits at the right of the legend, and at the left of the band in downloads. Borders follow Natural Earth’s default view and imply no view on disputed borders.
  • A choropleth has 3 to 7 classes (5 at first), as quantiles or equal steps. Places with no data are hatched.
  • A point map reads latitude and longitude columns, or one column of “lat, lon” pairs. Rows outside the valid range are listed under Map, not drawn.

Exporting and slides

The Export menu at the top holds Download image, Add to slides and Export links (on phones these sit under Data). Charts also have Download image and Add to slides in their settings panel.

Download image

  • Format: PNG, SVG or PDF. SVG is for charts and maps; layouts, and scatter, bubble and point maps drawn as more than 5 000 points, are pictures, so PNG or PDF only.
  • Quality (PNG): Standard (2x) or High quality (4x).
  • Theme: Sky (the night sky) or Paper (white, for documents). Paper is for charts and maps; layouts download in Sky.
  • Size: As on screen, 16:9 (1920 × 1080) or Square (1080 × 1080). A PDF is one page, 16:9 or A4 landscape.
  • Copy image puts the same PNG on the clipboard, if your browser allows it (with SVG chosen, the button says Copy as PNG).
  • Every picture has a band underneath with the Data Constellation watermark, linked to the site in SVG and PDF; it can’t be removed. Downloads of an example also say “Example data, made-up figures”, and maps carry their boundary credit.
  • Files are named data-constellation-bar-2026-10-28.png (the chart or layout, then the date), never after your files.
The Download image window over a bar chart, with Format, Quality, Theme and Size choices.
Download image.

Export links

Export links saves a CSV, data-constellation-links.csv, with one row for each record at each link point: link_point, key, table, row (the spreadsheet row), record_title and colour.

Slides

Add to slides keeps the view as it is: a chart or map with its title, join line, notes and credit, or a layout as a picture of the sky with its legend. Once there is a slide, a Slides button with the count appears at the bottom right and opens the tray.

  • Each Add to slides is confirmed in the notice at the bottom (“Added to slides (3).”), as is the limit. Retitle each slide, move it with Up and Down (or drag it), or Remove it. The tray holds up to 30 slides.
  • Slides are kept in this tab only: Start over or a reload clears them, but loading an example or a new project keeps them.
  • Download as PowerPoint or PDF, in the Sky or Paper theme (charts are redrawn in it; layouts stay Sky), on 16:9 or A4 landscape pages for a PDF, with an optional Title slide.
  • Charts and maps are vectors; titles and notes are editable text in PowerPoint, whose speaker notes list the chart type, its columns and the date. PDF pages carry bookmarks. The deck is named data-constellation-slides-2026-10-28.pptx (or .pdf).
The slides tray open beside a line chart, with two slides and the PowerPoint and PDF download choices.
The slides tray.

On phones, the Export menu’s items sit in the Data drawer, the legend and hover card are off, and the drawer, cards, chart settings and slides tray open as sheets from the bottom.

Keyboard shortcuts

Every control can be reached with Tab and shows a blue focus ring. On the sky (Tab to it first):

KeysWhat they do
+ or =, -Zoom in, zoom out
Arrow keysMove around (in Orb, turn the globe; not on a graphics-card sky)
F or 0Fit everything in view
EscClose, in this order: the tour, Download image, Start project, a colour pop-up, search results, the card, the drawer
In Find a value: Enter, ↓Open the best match; move into the results
Layout switch and view tabs: ← →, Home, EndSwitch layout or view
Menus and column lists: ↑ ↓, Enter, EscMove, choose, close
Start project’s drop box: Enter or SpaceChoose files

Screen readers hear what the sky shows (“Constellation, Records view: 130 records, 30 link points, 5 tables”), and each star opened (“Link point SRC-001, 11 records”). To open a point without a mouse, use Find a value, or Brightest points in the Data drawer. Dialogs keep focus inside them and return it when they close. With reduced motion set on your device, the sky doesn’t twinkle or animate, and layouts appear settled.

Privacy

  • Your files stay in your browser tab. They are read there and are never uploaded, stored or sent anywhere. Very large files are read by the large-file engine in the same tab, without being copied out of it. Slides and PDFs are made in the tab too.
  • Analytics only if you accept. The cookie box asks whether Evidence Systems may use Google Analytics cookies. If you accept, it counts page views and which features are used: an example loaded, how many files and tables were added, a view changed, a chart type opened, a map’s level, an image’s view, format, theme and size, a links export, slide counts, and that the mailing list form was sent (with where the form sits and which lists you chose). It never records file names, table names, column names or values. If you decline, nothing is loaded and its cookies are deleted. Change your answer with Cookie settings in the Data drawer.
  • A small note in your browser. The tool keeps a note in your browser’s storage that you have seen the quick tour (dc.tour) and closed the example notice (dc.notice), each with a version number or date, so they don’t show again. These are not analytics cookies, hold nothing about your files, and are never sent anywhere. Choose Reset tips under Help (on phones, under Data), or clear this site’s data in your browser, to remove them. Your cookie answer is kept the same way, for a year.
  • The mailing list. If you sign up for updates, the form sends only your email address, the lists you ticked (Data Constellation updates, Evidence Systems updates or both) and where the form sits, to Evidence Systems and its email service, Brevo. Your files are never part of it. Read how we use your email.
  • Map boundaries. When a map of districts is drawn, the tool loads that country’s boundary file from geoBoundaries on GitHub (media.githubusercontent.com); the chart gallery’s small previews never do. That request names the boundary file and carries nothing from your files.

Read the full privacy and cookies notice on the Evidence Systems site.

Troubleshooting and questions

My computer slowed down

While files load, Stop goes back to what was on screen before, with nothing half-built. Big uploads open Choose your data first: Recommended leaves long text out and keeps the links to about 60 000.

After loading, switch some links off or hide some tables under Data, use the Link points or Tables view, or use Constellation rather than Orb. The tool already draws link points instead of records when a view would hold more than it can draw smoothly, and says so in the notice.

My map shows unmatched places

Under Map in the chart’s settings, open the list of places that didn’t match. Each one offers “Use” with the closest name it found, or says there is no close name.

Those fixes are kept for this map only, and go when you open the chart again from All charts. To fix them for good, use ISO codes or standard names in your file, and check that the map’s level (Countries, Provinces or Districts) and country are right.

The chart you want is greyed out

A greyed-out tile names what it needs, such as “Needs two number columns”. The gallery looks at the chart’s table and the lookup tables linked to it (one row per shared value, through links that are on), and neither holds the columns the chart needs.

Choose another table with Table at the top of the gallery, or switch on the link to the table that holds those columns under Data. A tile lit from a linked table says “Uses a linked table”. Once a chart is open, its slots can take columns from any linked table.

A chart says it’s sampled

On a very large upload, read by the large-file engine, bar, line, area, pie and donut, histogram, treemap, heat map and choropleth charts add up every row exactly. The other charts are drawn from a random sample of 20 000 rows, and the notice under the title says so.

Scatter and bubble charts also draw a random 10 000 when there are more points than that, on any upload.

Can you use it for work data?

Your files are read in your browser tab and are never uploaded, stored or sent anywhere. Analytics, if you accept it, counts visits and which features are used, never file names, column names or values.

A map of districts loads that country’s boundaries from geoBoundaries on GitHub; that request names the boundary file and carries nothing from your files. Whether you may use a tool like this for your data is still your organisation’s call, so check its rules.

Known limits

  • Stars can’t be dragged on the bigger skies a graphics card draws, and the arrow keys don’t move them.
  • Some charts are drawn from a sample on very large files (see each chart’s entry).
  • Projects, colours and slides last only as long as the tab: there is nothing to save or sign in to yet. Links from the tool to this guide open in a new tab, so your project stays put.